Blueprints - Tool

Ziplex A33 (L) Blueprint (L)

Level 9
Type Tool
SubType Finder
Item Ziplex A33 (L)
Blueprint Book Limited (Vol. I) and (Vol. II)
TT 0.10
Markup
Links [Entropiawiki]
Qty Materials Cost Cost/M Cost/M(%)
2 Accelerative Matrix Component III 0.00 0.00
48 Basic Nuts 0.48 0.53 110.78%
4 Hardened Nuts 0.13 0.53 399.52%
2 Ignisium Ingot 4.20 5.02 119.59%
3 Iron ingot 1.17 1.21 103.35%
1 Lystionite Steel Ingot 4.01 4.01 100.00%
2 Narcanisum ingot 0.48 0.56 117.10%
4 Robot Thermal Sensor 1.40 1.40 100.00%
3 Simple III Conductors 3.30 3.33 100.88%
4 Zinc ingot 1.20 1.28 106.65%
16.38 17.88